Here we are at the end of the second week in the migration of a mission-critical Oracle Forms 6 application. The main points we dealt with are:
- AIX file transfert and compile processes
- LOV visual appearance (differences between 6 and 10g)
- Report rdf structure search in a batch mode from a keyword-based file
